Automotive Stamping System--Hot Stamping Line


Fori Mexico was involved in the relocation of an existing hot stamping line during production from Detroit, MI to Ramos, Mexico.

https://www.youtube.com/watch?v=k3MGrg7W9hA Timing for this project was critical, because it was going to take place during production.  The customer was required to build a bank of stampings for production while the equipment was being relocated. 1 The existing hot stamping line in Detroit was a singular process.  The customer requested that a new process in Mexico be a parallel process to improve the output of the system.  Fori was responsible for engineering the new process.  Fori developed the new system layout and completed all the robotic simulations with offline programming to verify the performance of the new parallel process system.  The customer requested that Fori use as much existing capital as possible to help control costs, therefore anything that was not available for reuse had to be built by Fori, including the controls of the new system. [gallery ids="1108,1107" type="square" columns="2"] Once the engineering was completed and signed off, Fori Mexico managed the installation, integration, and run off of the new parallel process.  Fori USA was responsible for project management, engineering, and quotation. For more information about Fori Automation's products, please visit our website.

Return